WorkManual Machined Parts
Manual Machined Parts
3 of 10 projects
Manual machining projects
3 projects8 photos5 videosApr 2025 – Jun 2025
-

Dirt Jumper V1: 12 days to Sea Otter 2025
A dirt-jump frame with SLS-printed Nylon 12 lugs bonded to carbon tubes, designed and built in 12 days for Sea Otter Classic 2025. , 3 videos -

Lathe Work
Turning parts on a manual lathe and checking them with a micrometer. -

Bike Pedals
A bike pedal I keep redesigning. The current revision is V4, "The Reboot." , 2 videos